Daily Cable Percussive Borehole Record
Location: Client:
Project ID: BH ID: Sheet 1 of 1
From: To: Geology Description Legend
Weather
Details:
Inspection Pit
From (m) To (m) Duration
Chiselling
From (m) To (m) Duration
Casing
Size From (m) To (m) BH Depth (m)
Water Added
Size From (m) To (m) BH Depth (m)
Redrill
Casing Size From (m) To (m)
Backfill / Standpipe Details
Comments / Standing Time / Dayworks
Total Standing Time: Total Dayworks:
Sampling & Testing
Type/# Depth (m) Casing Depth Water Depth Blows Test Drives Notes
From To 75 75 75 75 75 75
Groundwater
Time
Struck
Depth
(m)
Inflow
Rate
Depth After mins (m) Sealed
(m)
Sample
#
Sample
Depth
5 10 15 20
Water level - Start boring (m): Water level - End boring (m):
Completed Totals for Borehole
Depth (m) D B ES WS U SPT/CPT PS SV
Plant Details
Plant Type:
Plant ID:
Plant Test Date:
SPT ID#:
SPT Rod Type:
SPT Callib. Date:
SPT Energy Ratio:
Personnel Details
Lead Driller:
CSCS:
2nd Operative:
CSCS:
Site Engineer: